Two crew members in hard hats and orange vests guiding a drill rod at a borewell rig

Borewell drilling

Borewell Drilling, Planned Around Your Site

Precision drilling for borewells in a range of diameters, planned around access, ground conditions and intended water use.

Built around site conditions

  • Ground survey up to 800 m before drilling
  • Site visit and access planning
  • Casing and aquifer isolation planning
  • Installation coordination and handover

Inside a borewell

Borewell section: 150 to 300 millimetre bore with uPVC casing through to the aquiferGROUND LEVELWATER-BEARING ZONEuPVC casing, 10 kg/cm²Aquifer isolation by casingSlotted pipe in the aquiferDeveloped until the water runs clearbore diameter150–300 mm

Schematic illustration. Actual design depends on the site survey.

Our process

From surface conditions to working water infrastructure

  1. Two people in hard hats and hi-vis vests walking a cleared industrial plot, one carrying rolled site drawings, a marker peg in the foreground
    01

    Site Visit

    We assess access, ground conditions, water requirements and usage patterns to plan the optimal solution.

  2. A surveyor crouched over a resistivity meter on a cleared plot, with electrode stakes in a line and cable spools beside him
    02

    Survey

    Geological survey and water table analysis to determine drilling depth and casing specifications.

  3. Close view of a tricone drill bit entering muddy ground at a rig, a worker's gloved hand steadying the drill string
    03

    Drilling

    Precision drilling executed with proper casing installation and aquifer isolation for water quality.

  4. Two workers lowering a submersible pump into a borewell on a tripod, with an electrical panel and coiled cable beside them
    04

    Installation

    Installation of pump, piping and electrical components with pressure testing and flow rate verification.

  5. A site engineer shaking hands with a crew member beside a finished, capped borewell and its pump housing
    05

    Completion

    Site cleanup, client walkthrough, maintenance training and documentation handover for long-term operation.

Questions, clearly answered

Frequently asked questions

What bore diameters do you drill?

150–300 mm (6"–12") with our own rotary rigs and crews.

What casing do you use?

uPVC casing from 100 to 500 mm, rated 10 kg/cm² and ISI marked, planned to isolate the aquifer from the upper strata.

When is the borewell considered finished?

We develop the bore until the water runs clear and sand-free, then coordinate installation and handover.

Do you survey before drilling?

Yes. We offer a ground survey up to 800 m so the drilling point and depth are decided on evidence, not guesswork.

How do I get a quotation?

Share the site location and what you need through the proposal form or by phone. We review it and send a written quotation; turnaround and warranty terms are set out in that quotation.

Which areas do you serve?

Sonipat, Panipat, Kundli, Rohtak, Gurugram and Delhi NCR, from our base in Bahalgarh, Sonipat.

Planning a project?

Share your site and scope. We will review it and send a written proposal.

Request a proposal