A surveyor with a resistivity meter and electrodes laid along a field, explaining the survey to a farmer

Water testing

Groundwater Survey & Water Testing

A ground survey up to 800 m before the bore is drilled, and yield and water-quality tests after it is built.

Built around site conditions

  • Electrical ground survey down to 800 m
  • Drilling point and depth fixed before drilling
  • Written survey report with the recommendation
  • Yield and water-level test after drilling
  • Water-quality check (key parameters such as TDS and pH)

How the survey works

Ground survey: electrodes along the surface map water-bearing zones down to 800 metresGROUND LEVELWATER-BEARING ZONEWater-bearing zone locatedRecommended drilling point and depthResistivity metersurvey reachup to 800 m

Schematic illustration. Actual design depends on the site survey.

Questions, clearly answered

Frequently asked questions

How deep can the ground survey reach?

Our electrical ground survey reaches up to 800 m. It locates water-bearing zones so the drilling point and depth are fixed before any drilling starts.

What do I receive after the survey?

A written survey report with the recommended drilling point and depth. After the bore is built we also test yield, water level and key water-quality parameters such as TDS and pH.

Do you test water after drilling too?

Yes. A yield and water-level test follows drilling, along with a water-quality check.

How do I get a quotation?

Share the site location and what you need through the proposal form or by phone. We review it and send a written quotation; turnaround and warranty terms are set out in that quotation.

Which areas do you serve?

Sonipat, Panipat, Kundli, Rohtak, Gurugram and Delhi NCR, from our base in Bahalgarh, Sonipat.

Planning a project?

Share your site and scope. We will review it and send a written proposal.

Request a proposal